Page not found

Search results

  1. Design Review DR 23-08: Grating Pacific Building C

    1" = 50' FR ON T S T. 55 '-8 "± 121'-6"± 80 '-8 "± ... AREA INCREASE = 50% ALLOWABLE AREA = 34,000+17000 = 51,000 FT2 RE LE AS E FO R DE SI GN R EV IE ... en d Pla ce N E Su ite 12 0 Sa lem, O R 97 30 1 50 3.3 99.13 99 m sc en gi ne er sin c. co m D ec ...

    04/19/2024 - 10:07am

  2. Woodland Crossing Apartments

    Interior, flag or cul- 50 N/ A Approximately Minimum (feet) de- sac lot 650' Corner lot 80 156' N/ ... 90 feet and a minimum street frontage of 50 feet. The property line adjustment would decrease the lot ...

    03/21/2024 - 11:14am

  3. Design Review DR 22-13: Unitus Community Credit Union at 2951 Stacy Allison Way

    = 54,553 sf (1.252 Acres)-Proposed Building = 18,405 sf (5,800 sf / Floor + Roof Deck)-Parking = 50 ... 4 exterior, 8 interior (50% covered min)-Building Height = 45' (70' Maximum Allowed) Vicinity Map ... (1 per 350 sf)-Building Height = 55' (70' Maximum) FF=186.50 SANSANSANSANSANSAN ...

    03/21/2024 - 10:59am

  4. Pre-app PRE 23-20 Immanuel Lutheran Church Greater Woodburn Opportunity Center (GWOC)- Evergreen Rd at Linfield Ave

    out as 50 units. Please reconcile for the TIA. o In Table 5, the size of the “Government Office” is ... interchange. Many of the nearby approved developments assumed a trip distribution of 50% or more to the I-5 ... Annex for the first phase, followed by a second phase which would consist of a 50-unit affordable ...

    02/23/2024 - 1:51pm

  5. Ordinance No. 2603 (LA 21-02)

    perimeter of the building to the finish floor elevation (FFE) above is 6 feet or less for at least 50 ... has a gross floor area (GFA) of less than 50 percent of the GFA of the lower floor over which it ...

    06/18/2022 - 3:10pm

  6. Conditional Use CU 2020-01 Templeton Apartments- 1430 E. Cleveland Street

    bicycle parking within 50 ft of a main entrance. In the context of a new construction apt complex with ... instead of garages, the developer shall cover or shelter at least 50.0% of the minimum required parking ... building spaced to conform to the 50-foot distance provision of WDO 3.05.03E as applied through a Design ...

    04/04/2024 - 2:45pm

  7. Woodburn Development Ordinance (WDO)

    6 feet or less for at least 50 percent of the perimeter and does not exceed 12 feet above grade at any ... point; 2. A loft or mezzanine that has a gross floor area (GFA) of less than 50 percent of the GFA of the ...

    03/26/2024 - 5:09pm

  8. Conditional Use CU 22-04 Hardcastle Apartments 1755 Hardcastle Ave

    building permit plan set equivalent sheets to meet 3.05.03I.1 (max distance 50 ft) per Exhibit CU5b below, ... – Planning Commission Final Decision- Page 7 of 26 Exhibit CU5b EV max distance 50 ft Landscaping CU6. ... General: a. Bark dust: 5.0% max of landscaped area may be bark dust. b. Screening: Evergreen hedge or ...

    03/21/2024 - 10:42am

  9. Design Review DR 23-03: Commerce Way Industrial Park

    BY CALLING 50������1���� I) YOU HAVE ANY 4UESTIONS ABOUT THE RULES, YOU MAY CONTACT THE CENTER� YOU ... MUST NOTI)Y THE CENTER AT LEAST TWO BUSINESS DAYS BE)ORE COMMENCING AN E;CAVATION� CALL 50 ... GROUP, LLC.EITH WHISENHUNT, PE PLS ���� CROSBY ROAD NE WOODBURN, OR ��0�1 50 ...

    03/21/2024 - 11:01am

  10. Conditional Use CU 22-02 Townsend Farms Addition/Expansion- 960 Young St (2)

    unimproved unnamed City ROW 50 feet (ft) wide that runs northerly- southerly between 960 and 1030 Young ... 60 M/L 2135 41209.5 54.53 13.08MRS. 10 5 47.2273.91 3.76(193.50)92884.75 114.69100 80081.22 116653 ... R EC. 875900 100051.07 80N20 3 0W 220 VAC ATE D B Y O RD. 180 AN D 208 8(193.50) 85.25500 2201 89.6 ...

    03/21/2024 - 10:42am

Pages